Did you heat a cup of coffee in the office microwave, and then walk away and leave it there?
Crap! The coffee is cool again. In fact, the average temperature of all the elements in the microwave are about the same: the coffee, cup, and surrounding air. Whereas after first heating, the averages were quite distinctively different; the coffee was hot; the air was not so much. But after a bit, all discriminating differences are lost.
Said another way: Over time, and in isolation, "waste" increased, where, in this case, "waste" is the heat (energy) that was usefully in the coffee, but is now wastefully distributed throughout the microwave. The former distinctly organized sources of energy have become homogenous, bland, without contrast and shades of complexion. In effect: disorganized and wasteful; almost without value.What's happened?
Physics took over.
Yes but ..... Actually statistics is the underlying explanation for the increase in waste, and that idea will take us to project management (which constantly opposes waste)
So, what do we make of this?So read on; I'll get to project management shortly.
Inexorably, over time, and in isolation (that is: no outside influences or help), "disorder" (as opposite of "order") always increases until some equilibrium is reached. Distinctive differences degrade, becoming homogeneous.
And, by the way, value is lost .... The utility of the disordered is usually less than the ordered. Keep that in mind, project people!
The probability of a well ordered configuration is hugely less than a disordered one. Even for the coffee cup situation, there are very few ordered configurations; there are effectively infinite disordered configurations for the distribution of energy.
The 2nd Law predicts that statistically -- as things are approached asymptotically -- there will always be something missing; something lost; something wasted.Minimizing waste and lost value, and maximizing throughput thus becomes an exercise in working with the 2nd Law.
And, by the way, who among us have not seen such in the corners of large bureaucracies, oversized project offices, and similar locations? We're likely to say: Does anyone care?Projects that are highly isolated by security protocols, or physical remoteness, or by uninterest and lack of attention are vulnerable to the inevitability of the 2nd Law.
If external stimulus, energy, and interest are cut off, then the 2nd Law predicts blandness; lack of innovation, productivity, and morale; an increase of waste; and a general race to the bottom where a minimum effort is maintained.
- In project terms, this means re-energizing individuals, individually. (Giving everybody a new T-shirt or coffee cup won't restore individual leadership, energy, and innovativeness).
- This means aggressively combating wastefulness, non-value add activity, and a general acceptance of 'shit happens'
- This means allocating time and space, away from the project, for recharging.
- This means that selective (and genuine) attention to the project by outsiders is mandatory.
- And, this may require rotation to an outside activity to spark new behaviors.
- Not least: mitigating some physical remoteness and isolation.